arrow-up

Eaves Flashing for Standing Seam - 3m

£35.94
(2)
Cladco Eaves Flashings are installed under Standing Seam Roofing Sheets to provide a suitable edging for Sheets to be clamped on to. Our Eaves Flashings measure 3m in length and feature a coating of GreenCoat® Pural BT for a scratch-resistant finish.
delivery NATIONAL DELIVERY - checking... from £192.00
Total Price: £35.94 inc VAT
Order Sample Pack
loader
Loading...
Details

More About Cladco Eaves Flashings

Cladco Eaves Flashings for Standing Seam have been designed to create an overhang on your Standing Seam Roofing project. Eaves Flashings allow for Standing Seam Roofing Sheets to be clamped onto securely to create a sealed roof design.

Our Eaves Flashings measure 3m in length and are 200mm wide, your Standing Seam Roofing Sheets will need to be installed on top of your Flashing for a professional finish. 

The coating is an environmentally conscious material, GreenCoat® Pural BT, that creates a durable finish with corrosion, UV, scratch and weather resistance. SSAB Nordic quality steel has been used in the manufacturing of these Flashings for the best quality.

The steel used to make our 3m Eaves Flashings for Standing Seam is A1 fire rated to BS EN 13501.

For a full list of tools required and how to install Standing Seam Flashings, please refer to our Standing Seam Installation Guide.

Looking to order your Sheeting? See our Standing Seam Roofing Sheets to discover all of our options.

Want to see our full range of Flashings for Standing Seam? Head to our Flashings page.

Please note: Images and colours above are used for illustration purposes only. Actual item may vary slightly from the image displayed.

Diagram showing Standing Seam roofing flashings.
Diagram showing Standing Seam cladding flashings.
Read more Read less
Features Video plus minus
Play Video
Samples plus minus

Order A Sample Pack!

The best way to choose your preferred colour is with our Sample Packs. Order Sample Packs
How To Calculate Square Metres plus minus

Working out the total square meterage of your roof will require measuring the total width of the roof’s area as well as the distance from the eaves (the lowest point) to the apex (the highest point) of the roof. This should be undertaken carefully and safely.

We recommend taking these measurements from the inside of your building for safety purposes. Multiply the two measurements together to give the total square meterage of the roof.

For apex, or dual-sided, roofs, you will need to work out the square meterage of each side of the roof and add the numbers together for the total coverage.

Installation Guide plus minus

pdf Download our printable installation guide.

Specifications plus minus
Weight
4.37kg
Flashing Type
Standing Seam
Technical Information plus minus

pdf Download the datasheet for Eaves Flashing for Standing Seam - 3m

Delivery plus minus
Type When? Cost?
National Delivery Orders under £1,000 Est. 5 working days*
Roofing items 7-10 working days*
£192.00
Orders over £1,000 Est. 5 working days*
Roofing items 7-10 working days*
£96.00
Orders over £1,500 Est. 5 working days*
Roofing items 7-10 working days*
FREE
Scotland Delivery Est. 15 working days*
Roofing items 7-10 working days*
£360.00

Millboard Delivery Orders under £2,000 Est. 5 working days* £192.00
Orders over £2,000 Est. 5 working days* FREE

Parcelforce Standard (Small Parcels) 3-5 working days* £8.50
Parcelforce Standard (Large Parcels) 3-5 working days* £30.00

Sample Packs via Courier 5 working days* FREE

*Please allow for public holidays and weekends (non-delivery days) 

Collection plus minus

Some of our products are available for collection from our warehouses in Okehampton (Devon) and Andover (Hampshire) - This option will show at checkout, when available.

Standard collection lead time is 3-5 working days, this may vary depending on the product. If you would like to collect your order after 2 hours, please choose this option at checkout.

Please note that collections are only available from Monday-Friday, 08:00 - 17:00 & Saturday, 08:00 - 12:30 (Note: this IS the cut off time for collections, despite our closing time of 13:00)

Please Note The Following Prior To Collection:

No Cutting On Site

PPE/Hi-Vis Must be Worn At All Times

AlL Visitors Must Report to Reception


Vehicles we can and cannot load

Cladco Profiles will only load flatbed lorries and flatbed trailers for insurance purposes. If the appropriate vehicle is not available, two people would be required for a collection.

Cladco Profiles will NOT load any vehicles with roof racks, horse boxes, cattle lorries or fixed-sided trailers. Cladco Profiles has the right to refuse loading a vehicle for any reason.

Before arranging a collection, please read our Customer Collection Notice below.

Okehampton

Our Okehampton HQ and Warehouses (Devon)

Hampshire

Our Andover Warehouses (Hampshire)

Read more

Customer Collection Notice

For those customers wishing to collect materials, we ask you report to the office first in order to be seen by a member of the sales team. Your goods will then be picked and brought to your vehicle.

Please note that during busy periods you may experience a wait while our yard staff serve other customers or are loading/unloading other vehicles.

We respectfully draw your attention to the following points:

  • It is the ultimately the responsibility of the customer to load his/her vehicle and to ensure the goods are safely/ securely strapped down.
  • Our staff will be happy to assist you load your goods onto appropriate vehicles by way of fork lift trucks. Our staff will not handball any goods into enclose vehicles. The loading of the vehicle is carried out entirely at the customers own risk. We will not be held liable for any damage that may occur to your vehicle or goods collected from our premises during the transport of said goods.
  • It is the responsibility of the customer to ensure both their vehicle and the goods are safe when they leave our premises.
  • We can advise the approximate weight of materials prior to you arriving so that you can be sure your vehicle is capable of carrying the intended load. Please ensure that you bring appropriate ropes, straps or other securing materials as we are unable to provide you with any upon arrival.
  • We strongly recommend you bring suitable protection materials to prevent your ropes/straps etc. be damaged by these edges. We recommend that you use good quality protective gloves when handling materials.
Read less
Frequently Asked Questions
No Questions

Did you find what you were looking for?

Reviews
Customer Reviews
5 Based on 2 reviews
Great Company and product

Price

Quality

Value

Staff were helpful and didn’t have any issues with my order, will use again in future projects.
Was this review helpful?
Good quality

Price

Quality

Value

Quality of the product is good, bought several other flashings as well and pleased with my order. Would recommend to others.
Was this review helpful?
Prev
Next
You're reviewing: Eaves Flashing for Standing Seam - 3m
Your Rating *
Images

check-circle You submitted your review for moderation.

loader
Loading...
loader
Loading...